|
This video shows the Stainless Steel Cable Railing System in more detail.
Part 2 B |
Next Installment of walk thru video.
Insulation is being installed. Cable Railing installed. Stair System installed. Exterior upper floor exterior wall claddings installed. Part 2 A |
|
This first in the series of videos showcasing this Fuel City Model shows, The structure progress at three weeks.
The main frame and the secondary framing as well as some of the exterior materials are discussed and showcased. Part 1 A |
|
Part 1 B
|
|
Part 1 C
|
|